
OAG have built on past work of the Olinda Primary School community by establishing a restoration and re-vegetation program that will re-instate Charlemont Bush Walk, between the Olinda shops and the school, as a public asset.Keep watching this space ... Charlemont Bush Walk, Olinda-Monbulk Road, Olinda. |
|||
|
|
19 October 2002Angled onion (onion weed), climbing ivy, holly, montbretia... You name it, this land was infested with it |
![]() |
November 2002An extensive weed removal program was started. Some doubted our wisdom -it looked so green before - but restoration of degraded spaces takes time |
![]() |
2002-2005100's of bags of environmental weeds were hand-removed from the site. |
![]() |
December 2003The last of the dumped rubbish is removed. Hopefully the dumping of rubbish will stop occuring as it becomes obvious that this site is being cared for. |
Why bother? |
|||
2004-2005The locally native plants that were unable to break through the dense weed growth before, are now germinating and flourishing. This one is Soft Crane's-bill, Geranium potentilloides. |
![]() |
These were hiding amongst great masses of uncontrolled holly and ivy. Tasman Flax-lily, Dianella tasmanica, and Mother Shield-fern, Polystichum proliferum are commonly found in the local bush. |
|
It's worth it |
|||
22 April 2006The targets. Seedlings of Ivy, Holly, Pittosporum We're getting on top of it... |
22 April 2006Mark and Paul concentrated on the Ivy starting to climb the two mature Mountain ash located in the Olinda shops carpark area |
||
22 April 2006The fungi are amazing |
22 April 2006Many people are noticing the changes - and loving it! We were told a number of times today, "I feel so guilty walking past you. You are doing a fantastic job". |
||
| Thanks to Paul, Bruce, Mark, Geoff, Rhonda, Barbara, Sue, Christina & Scott for their work on April 22 .... and to Josie, the 4 legged companion of Paul who locals couldn't walk past without admiring, helping us start up conversations! | |||
24 June 2006It started out a cold & brisk morning, perfect for weeding?? When the rain got the better of us, we took time out for a quick check on the Stump works - nearly complete... before heading to Noel's Cafe for a great lunch. A great part of working bees is the social time afterwards. |
24 June 2006We concentrated on hand weeding Angled onion today & sprucing up the front section of Charlemont. The Sycamores are tagged and due for removal in July. We aim to plant up the front section of the block after they are gone. |
||
| Thanks to Paul, Bruce, Mark, Geoff, Rhonda, Barbara, Sue, Margaret, Christina & Geoff for their work on June 24 .... and to Josie, of course! | |||
| Paul lives in Upwey but is often at our working bees. I asked what brings him back, "I spend a fair bit of my social time in Olinda & Mt Dandenong, so I feel it's good to contribute to an area I feel a strong connection with." | |||
2 July 2006The Sycamore Maples & dead Sweet Pittosporum are felled on the site |
2 July 2006Piles of timber from the woody weed removal litters the site for the time being... |
||
| Our November '06 working bee drew a participant from as far afield as the UK. "If I was at home I'd be doing the same thing (helping out at an environmental groups working bee), so it's great to be able to come along with Jess today & help." | |||
![]() |
11 November 2006The objective - clean up the front section of Charlemont Bush Walk, & prevent flowering (& subsequent seeding) of Summer weeds. |
![]() |
11 November 2006Although the large Sycamore Maples have been removed, there was a carpet of seedlings coming up that needed to be removed. |
![]() |
11 November 2006Chris & Anja take a break to try out Anja's tricycle on the new pathway |
![]() |
11 November 2006An hour later, and we have a cleaned up area ready for Autumn planting on March 4, 2007 - Clean Up Australia Day. |
| Thanks to Phil, Sue, Jess, Frank, Betty, Bruce, Mark, Rhonda, Sue, Margaret, Julian, Fiona, David, Paul, Debbie, Chris & Anja for their fantastic work on November 11. | |||
| Photos: Sue T & Mark F | |||
| What else has OAG been doing? | |||
OAG have successfully lobbied for the installation of a pathway to link the Olinda township with sporting and cultural facilities. OAG are now actively involved in an environmental weed eradication program along its length. |
|
![]() |
3 March 2004While the boys were busy posing for photos, the girls and the kids were digging holes, planting trees and shrubs, cutting back and poisoning blackberries, holly & ivy and securing tree guards around the new plantings. Once done, we'd headed off for a well earned lunch before the boys got their working gear dirty. This section of the path is between the helipad and Olinda-Monbulk Road. Check out the new work completed on National Tree Day 2005 & 2006 |
| Photos: Sue T, Mark F | |
| What else has OAG been doing? | |
OAG are interestedin talking to anyone who has an interest in the propagation of indigenous (locally native) plants. Local public spaces will be re-vegetated with these plants |
OAG currently source its plants from community nurseries such as Candlebark Community Nursery and Southern Dandenongs Community Nursery. The Shire of Yarra Ranges support us in doing this, through the supply of vouchers. OAG members also grow some indigenous plants to supplement these supplies, re-vegetating the local area with seed stock sourced locally. Would you be interested in volunteering some time & garden space to help with this activity? No special knowledge is required, just an interest in learning & participating. Feel free to talk to us if you'd like to share your knowledge or find out more. |
| What else has OAG been doing? |
OAG are regularly invited to have representation on working groups and committees to further environmental and community issues for the Shire of Yarra Ranges and more specifically, for the Olinda & Mt Dandenong communities.In 2006, OAG is represented on the following working groups or committees: |
|
| What else has OAG been doing? |
24 June 2002 |
A 100 year old Mountain ash is felled in the Olinda township due to the breakdown in planning controls. |
|---|---|
25 June 2002 |
At the Shire of Yarra Ranges Council meeting of 25 June 2002, a 7 point resolution concerning the Olinda community was passed unanimously. Point 4 stated: "An Olinda Township Plan be prepared in consultation with the community, including plans for retention and revegetation of trees within the township." |
2 July 2002 |
OAG is formed |
July 02 - Dec 04 |
OAG is assured the Olinda Township Plan is coming, but no date is yet set. |
18 February 2004 |
OAG & OCH hold a community meeting to discuss the future of the Olinda township from a resident’s perspective. 90 people attend. OAG & OCH invite the Shire of Yarra Ranges to participate. |
21 April 2004 |
The Shire convenes the first Olinda Community Planning Group. The Group recomends that this should be Olinda & Mt Dandenong Community Planning Group. |
19 June 2004 |
The Olinda & Mt Dandenong Community Planning Day is held. |
10 March 2005 |
The first draft of the Olinda & Mt Dandenong Community Ideas Report is made available to the Community Planning Group. |
May/June 2005 |
Major revision of this document is undertaken. |
September 2005 |
The Olinda/Mt Dandenong Community Ideas Report (2mb PDF file) is presented to the Planning Group for approval before becoming a public document. You can offer your thoughts and/or participate in its recommendations. Find out how by downloading a copy. The Planning Group now declare themselves the interim group and call for nominations for the ongoing Group. |
February 2006 |
A network meeting of other 'Township Groups' throughout the Shire is hosted by MADCOW at Monbulk. Some informal discussion indicates an interest in investigating how MADCOW & Olinda/Mt Dandy may be able to work together. The two communities benefit each other, and issues are similar in some areas. Worth investigating further... |
June 2006 |
Ridge Top Communities Group (formerly Olinda/Mt Dandenong Community Planning Group) formalises. Primary office holders (Chair & Secretary) will be rotated each 6 months, with the Minutes Secretary role being rotated each meeting. Group objectives are discussed. |
October 2006 |
OAG have nominated for representation on the Shire's recently launched Hills Project, to ensure the information coming from the Community planning days is not lost. |
OAG have lobbied for Shire of Yarra Ranges wide environmental compliance and education initiatives to be accelerated and supported, including the Mountain Ash Protection Program and the Register of Significant Trees |
| This isn't happening as quickly as we would like... Your support would be valued. Contact your local Councillor or the OAG committee |
| Back to what OAG have been doing |
National Tree Day events |
|
July 30, 2006 |
|
![]() |
National Tree Day 2006 - pre event promotionYou too can be part of the pre-event publicity for 2007. This photo made it into the local papers & helped us drum up some local enthusiasm Image courtesy of Steve Tanner, photographer, Free Press Leader |
![]() |
National Tree Day 2006 - pre event promotionGetting in the swing of it before the big day Image courtesy of Steve Tanner, photographer, Free Press Leader |
National Tree Day planting
|
|
2006. What teamwork! Friends, neighbours, TAFE students & strangers (until today!!) joined forces to dig, plant, stake, bag, water & mulch the tubestock. Great job. The coffee & cake afterwards was pretty good too! |
|
2006 Geoff's water tank & pump was a welcome sight! Watering in the plants is always the tough part when working on a site nowhere near a garden tap. This was a great addition to last years tree planting plans. We hope to see a much improved survival rate this year. |
|
2006 After the team hand-pulled Fog Grass (weed species) and supplemented last years plantings, Sarah & Mark followed up with a much needed mulch layer - we are hoping to out compete the weedy grasses this year. There's a good layer of the groundcover Bidgee Widgee growing here. Gilda was interested to learn that this is a 'good one' to encourage at her house - it will help to suppress unwanted weeds. Some people dislike the seedheads that appear in Summer - they get caught in your socks - but if kept away from your paths, they'll do their thing without worrying you. |
|
2006 Once we finished one plant cell, we moved onto the next. We had 4 plant cells to work in this year. OAG will routinely come back over the course of the year to check that weeds aren't taking over the planted areas. ParksVic & Shire of Yarra Ranges mow the larger grassed areas surrounding the plant cells. We love the look of rows of tree guards... |
|
2006 Thank you to everyone for coming & working so hard. "More hands make light work," Christina observed. OAG couldn't have done it without you. Thank you to Mark, Geoff, Bruce, Sue & Joe from OAG (for all the behind the scenes preparation work). Thank you to Gaye & Kelly (SYR environment department) for their help & support in preparing the area & ordering plants. Thank you to Southern Dandenong Community Nursery for their work in propagating the plants. Thank you to David & Monika at 'For Evergreen on Olinda' for fabulous coffee & cake afterwards & welcoming us working clothes & all! Bring on Tree Day 2007! |
|
July 31, 2005 |
|
National Tree Day planting
|
|
2005. Understorey plants go inThis area used to be choked with ivy and holly. Over the past 2 years these have been removed, canopy trees planted and now... understorey plants are going in. Andrew, Catherine & Hannah came from Silvan today to lend their support to the Tree Planting Day. They have been revegetating their own property and are enthusiastic about supporting other people and communities who are working to restore the natural bushland. Their help, enthusiasm and expertise was much appreciated. |
|
2005. Time for a chatAs always, the boys are standing around chatting while the girls are at work in the background! The tree in the left foreground was planted 18 months ago. It was 15-20cm tall when it was planted, and is now 2 metres tall. We have an amazing growing climate in the hills. |
|
2005 More plants. More stakes & tree guards.
|
|
Watch this space grow - Olinda-Monbulk Road pathway, in front of the helipad.People came from Chirnside Park, Silvan, Mt Dandenong, Olinda, Kalorama, and Wantirna to join in the fun. |
|
| Photos: Sue T, Rhonda F, Mark F | |
| What else has OAG been doing? | |
28 May 2004 |
Unknown to the local community, the Minister consented to Optus Singtel instaling a fibre-optic telecommunication cable through Dandenong Ranges National Park from Liverpool Road, Kilsyth to Burkes Lookout, Mt Dandenong via a Section 27 Licence. 7 kilometres of trenching is required. This site has full exposure along the western face of Mt Dandenong, from the surrounding suburbs. The Parks Victoria Management Plan for this area categorises it as "significant". The planning process had been underway for approximately 18 months. |
|---|---|
18 June 2004: morning |
Signs were erected on Burkes Lookout gates to indicate proposed works and provide contact telephone numbers. An excavator was being used on the pathways within the Park |
18 June 2004: afternoon |
A local resident contacted OAG for its support after discovering that the early morning noise was Optus Singtel starting work, without prior community knowlege. |
23 June 2004 |
The Fibre Optic Cable Deployment Environmental Management Plan (EMP) and Environmental Assessment (EA) was sought. Discussions were held with the works engineer. Works were stopped for a period of 1 week, pending further discussions. |
24 June 2004: morning |
There were major contradictions between the EMA and EA reports and the information supplied by the Optus works engineer |
24 June 2004: afternoon |
A discussion between OAG and Optus’ Environment Manager saw him acknowledge that we had "..valid concerns." OAG requested a meeting between residents, Paul Mechelen , Noel Cliff, (SYR councillor), James Merlino MP , Parks Victoria staff , Optus Singtel Environment Manager and the works engineer. The objective was to ensure a better result for the Park and ensure that utility authorities apply good environmental standards. |
24 June 2004: evening |
Optus agreed that the concerns were legitimate. The cable will be going through the |
3 July 2004 |
Follow-up meeting is organised by OAG with all key stakeholders to see a draft of the revised EMP and review progress on the undertakings Optus agreed to. Very disappointing meeting, with technical reports not being presented by Optus. With much difficulty one community member had been able to procure them just before the meeting. Tactics to control the flow of information we wondered? The community & Shire reps believed that there were 'shortcuts' being taken on the agreed undertakings from 24 June meeting. Lessons were learnt in ensuring that clear, agreed minutes are recorded at such meetings. Many concerns are raised with Parks Vic, James Merlino MP, Shire and Optus. It was considered that pieces of the arborist and zoologist reports were being taken without considering their full context. A disturbing side issue of the immediate concerns was that the commissioned arborist reported significant prior damage to vegetation when the existing path was put in. How could this occur in a significant area of our National Park? |
5 July 2004 |
Works begin. An alternative route that leaves the park at " |
7 July 2004 |
The arborist and zoologist reports are emailed to OAG, Paul Mechelen and community members from Optus via Parks Vic. Concerns are raised with Optus about works beginning without an arborist being onsite, as agreed 24 June. James Merlino MP and Paul Mechelen work actively to assist. |
9 July 2004 |
James Merlino MP advises OAG that Optus had now agreed to more testing of potential to vegetation damage, as requested, with Paul Mechelen and an independent arborist onsite. Works postponed until a satisfactory report is received. |
Parks Vic tells us |
"Telstra is wanting to go through Bunyip State Park, but after this experience, we will ensure that community is brought on board early in the planning stage." |
OAG says |
The community worked together well to improve the planning of the proposed works; from here it was up to Optus and their contractors to comply with the revised EMP and to work in a sensitive manner. The events of these three weeks had certainly raised the awareness of Optus, their contractors and Parks Victoria about the potential risks of these works. The additional steps they now took to satisfy the community were basic and essential to any properly considered engineering works in a National Park. The next challenge for Optus and Parks Vic was to monitor and supervise the contractors, avoid any unforseen "accidents", and to undertake the follow up program prescribed in the EMP. The community will be watching.
Special thanks is due to James Merlino MP, Cr Noel Cliff, Paul Mechelen and the management of the Shire of Yarra Ranges for the support they gave the local community on this. Their support were important factors in OAG having confidence that serious potential impacts on the forest were properly considered by Optus. It is a pity that Parks Victoria had, weeks before, given approval to a project that had so many unresolved issues around it. The local community had to scrutinise this project and devote much energy to convincing Optus to examine these issues and their implications for the fauna and flora in a National Park. Even with our limited expertise, it was obvious that there were many inconsistencies between the Optus EA and EMP. Some important recommendations of the EA and EMP were going to be ignored and without any justification or additional evidence. Optus' own Environment Manager said many of our concerns were valid and needed to be addressed. Essential services, we learnt, have right of access to public spaces. OAG certainly learnt many things along the way, and feels that others did too. Lets hope. |
Last words |
The EMP and EA stipulate follow-up monitoring of the vegetation and pathways along the fibre-optic route over many years..... If you haven't been there, it's a great place to go for a walk and is a good example of different vegetation types as you move down the pathway. From wet forest at Burke's Lookout, narrow-leaved peppermint gum, mountain grey gum, long-leaved box and messmate to Grassy-dry forest in the mid section and Shrubby foothill forest at the Kilsyth end. Enjoy! |
23 June 2002 |
An electricity company made evening telephone calls to some local residents living in the area of what is now called 'The Stump', advising that a dangerous tree was being removed the next morning and the road would be closed. Some residents asked a few questions and learnt that the root system of this tree, one of just a handful of old growth Mountain Ash, Eucalyptus regnans, remaining in the Olinda township had been severed. The tree was now dangerous. |
|
|---|---|---|
24 June 2002 |
Despite the local community banding together that night & the next morning and trying to save this tree, it was felled. The damage had been done, irrepairably. It was the direct consequence of poor development practice and monitoring. At the time of its death the Mountain ash was 100 years old, 43 metres tall and had a spread of 22 metres. Mountain ash live for up to 400 years. Mountain ash are the worlds tallest flowering tree and found in only a few localities - a small area of the upper Dandenong Ranges being one. Mature Mountain ash provide habitat to innumerable species of native flora and fauna. It is a special environment we inhabit. |
|
25 June 2002 |
At the Shire of Yarra Ranges Council meeting, a number of local people made submissions to Council, protesting what was an avoidable consequence. A 7 point resolution concerning the 1. Within two months a full report on the removal of the Mountain Ash tree at |
|
2 July 2002 |
A public meeting was held in Olinda and OAG formed - a direct consequence of The Stump incident. Check out OAG's story & background |
|
July - Dec 02 |
OAG were represented on the Olinda Mountain ash Review Panel that completed Points 1&2 of the Council Resolution of 25 June 2002. Point 3 will require ongoing monitoring by the community at large |
|
July 02 - ongoing |
OAG has lobbied continually for Point 4 of the Council Resolution of 25 June 2002 to be actioned. The process has begun. Read more about how the Olinda Plan process began and what stage it is at OAG invites your questions to Council on the progress of Point 6 of the Council Resolution of 25 June 2002. Some progress has been made... |
|
17 July 02 |
Advice from Russell Kennedy, Solicitors, to Ian Gibson (Shire of Yarra Ranges, Director Environment) in regard to Point 7 of the Council Resolution of 25 June 2002 , was that the definition of ‘vegetation’ needed to be defined to include root damage in Clause 53 of the Yarra Ranges Planning Scheme. Legal action would not be successful in the case of The Stump as the Shire Planning Scheme did not cover root damage, and the subsequent loss of vegetation. The damage must occur above the ground level. OAG have lobbied to have this situation remedied in the Shire Planning Scheme. It is unclear whether this has occured. |
|
July 02- June 04 |
Progressing Point 5 of the Council Resolution of 25 June 2002 - The Stump. OAG worked actively with the Shire Urban Designer to develop a simple commemorative plaque for The Stump. The primary objective was to see a plaque at the site. The wording for the plaque is detailed here. This process involved presenting design drawings to the Olinda/Mt Dandenong Planning Group for comment. Much work was needed to 'tone down' draft 1. Funds were allocated in each financial year budget for its installation, but this was repeatedly postponed. |
|
19 June 04 |
The 2nd draft of The Stump design is scheduled to go before the community for comment at the Shire's Olinda/Mt Dandenong Community Planning Day. This did not happen. Resolution and construction is held up again. |
|
17 Aug 04 |
Work began on The Stump without community knowledge & without signing-off the design/works. |
|
18 Aug 04 |
Discussions with the Shire resulted in the works stopping until an agreed design had been established |
|
mid 05 - Jan 06 |
A new project coordinator at the Shire, gets things moving. A design is re-drafted, a model is made & presented at numerous events, meetings are held, the go ahead is given by all | |
25 January 06 |
An onsite meeting with the works contractor, Shire and OAG discuss the finer detail | |
March 06 |
A date is set to begin works on The Stump |
|
April 06 |
Progress. Charlemont Bush Walk pathway begins. Roadbase goes down. (The Lilydale toppings have since been added). and.... The Stump works have begun. OAG would like to thank Jane Sinnamon, SYR Urban Design Landscape, for her work to hurdle past barriers and get this project completed. Thank you Jane. |
|
24 June 06 |
The seat is installed & the Lilydale toppings are in place for the path. The plaque is in its final design draft before construction... It's heading toward an August finish date |
|
11 November 06 |
...unfortunately the base stand for the plaque had a design fault & wasn't as solid as first thought... V2 is in production & we're looking at an early '07 completion date. | |
| The Stump and Charlemont Bush Walk are all part of a vision to see our community spaces linked, and to profile the special qualities of our natural environment. Watch this space for a celebration date of the Stumps completion | ||
Wording for The Stump plaque |
||
Eucalyptus regnans, Mountain ash, are the world’s tallest hardwoods (flowering plants). They live up to 500 years of age, reaching 95 metres in height. Mountain ash are indigenous to this area and provide habitat to a wide variety of local fauna. The Olinda community’s distress at the sudden and premature loss of this tree has brought us together to consider the way we all impact on the environment we value. We invite you to now stand at this site and consider how we can all work together to protect the natural beauty of this area for future generations. Age: 102 years; Height: 43m; Girth: 6m; Spread: 22m Accompanied by an historical photo of Olinda, circa 1908, showing the tree as a sapling |
||
Clean Up Australia Day events |
|
Clean Up Australia Day, March 5, 2006This is the first year OAG has registered for this event. It was the perfect opportunity to hang out with friends, make new ones and do some preparation for National Tree Day in July.
|
|
What can a few people with 2 hours, secauters and a dabber bottle do? Clear the understorey of this beautiful treed site from environmental weed |
|
Now that looks heaps better. No holly . No climbing ivy. Offering a fantastic opportunity for the natural understorey layer to flourish beneath these beautiful trees |
|
The holly was no match for an enthusiastic group with 2 hours to spare. Thank you Anja, Chris, Janine, Margaret, Robyn, David, Paul, Debbie, Sue, Bruce, Geoff, Neil, Barbara, Christina, Scott, Roslyn, Rhonda, Andrew, Mark & Laura. There's still a bit to do on this site, but check out the progress next time you're going past. |
|
| Next event: Sunday March 4, 2007. Keep watching our Upcoming events schedule for details | |
| Photos: Sue T | |
| What else has OAG been doing? | |
2006 |
Tony, an OAG member, brought the sad state of disrepair of the Kyeema memorial site to OAG's attention. He wondered whether OAG would be able to do anything about this. We were looking for local stories of interest at the time, to be included on theHillsOnline website. |
|
|---|---|---|
Mac was identified as a local person who knew a lot about Kyeema. We arranged to interview him, and find out more. As a consequence of this story, OAG began discussions with Mt Dandenong & District Historical Society about the memorial site, and their interest in joining forces with us in improving the site. (At the same time, the Historical Society had considered reviewing and re-publishing a booklet they had previously commissioned about Kyeema). A partnership developed to progress a plan for improved signage and access to the memorial. |
||
| OAG contacted James Merlino MP to engage his assistance, as the memorial & crash site is sited in the Mt Dandenong National Park | ||
| Mt Dandenonng & District Historical Society wrote to the Shire of Yarra Ranges to improve the off-road carpark. This was subsequently graded, and the Historical Marker sign on Range Road re-instated. | ||
| 24 June 2006 | An on-site meeting between OAG representatives (Mark & Sue), Mt Dandenong & District Historical Society representatives (Pat, Geoff & Mac) and James Merlino. As a group, we decided to pursue a Cultural Heritage funding grant to erect interpretative signage in the carpark area, and directional signage to the memorial cairn, with improvements to the carpark area. Next steps: investigate what the Shire will assist with in terms of carpark management. Investigate best grant options, investigate land ownership boundaries & do some groundwork into what signage/information would be valuable. |
|
November 2006 |
Mt Dandenong & District Historical Society have taken the lead in drafting a design for the signage. They are looking to apply for funding in 2007. OAG have offered their support. | |